Destroyed
Wharf repair operations taking place at section 44N. Barge on site. Mooring prohibited.
Diving operations taking place at pillar 14 of the Jacques-Cartier bridge from 1100 UTC until 2300 UTC Nov 21 2024 until Nov 26 2024. Barge and tugs on scene. Minimum wake.
Permanently relocated to 47 39.019N 065 37.848W
Unreliable, on emergency light
Victoria MCTS. All VHF transmit and receive services located at Gabriola Island off air 200227 UTC Nov 2024.
Shallower depths located at:
48 21.364N 089 13.181W, 1.5 metres48 21.376N 089 13.219W, 1.4 metres48 21.387N 089 13.245W, 1.3 metres48 21.406N 089 13.275W, 1.0 metre
Eight subsurface scientific moorings temporarily established at:
49 09.901N 067 30.832W49 04.351N 067 47.323W48 58.246N 067 37.407W49 04.436N 067 20.300W49 12.875N 067 11.894W49 12.065N 066 51.332W49 21.371N 066 44.913W49 19.372N 066 29.287W
Moorings extend approximately 1 metre off the bottom.
Permanently relocated to 47 49.214N 064 50.016W
Diving operations underway in Lark Harbour in the vicinity of 49 05.978N 058 21.643W.
Caution.
Wharf reconstruction underway in Lark Harbour in the vicinity of 49 06.069N 058 21.866W.
Geophysical survey taking place daily from 1100 UTC until 2300 UTC beginning 20 Nov 2024 at the port of Cap-aux-Meules.
Missing
Damaged and unlit
Off position
Three can buoys have been deployed off the Royal Vancouver Yacht Club for the ongoing breakwater upgrade project.
The can buoys are located at 49 16.509N 123 10.979W, 49 16.487N 123 10.875W and 49 16.600N 123 10.100W.
Debris removal, boulder removal, and dredging operations are underway in the areas bounded by the following coordinates:
Exit Channel:
47 18.680N 053 58.223W 47 18.540N 053 57.907W 47 18.307N 053 58.122W 47 18.482N 053 58.503W
Floating dredging pipeline assembly and deployment operations are underway within the area bounded by the "Exit Channel" coordinates. The pipeline will be fitted with lights and radar reflectors with combined total length measuring approximately 596 meters. Pipeline anchor positions will be individually marked by yellow cautionary buoys.
Inner Channel:
47 19.571N 053 57.575W 47 19.584N 053 57.063W 47 18.944N 053 57.027W 47 18.931N 053 57.539W
Outer Channel:
47 20.850N 053 58.760W 47 20.468N 053 57.347W 47 20.154N 053 57.588W 47 20.542N 053 59.030W
Environmental monitoring buoys equipped with lights and radar reflectors deployed in:
47 19.969N 053 59.099W
47 19.725N 053 57.066W
47 19.686N 053 56.798W
Removed boulders are to be relocated to the areas bounded by the following coordinates:
Inner Channel Boulder Relocation Area:
47 19.089N 053 57.115W 47 19.092N 053 57.036W 47 19.653N 053 57.067W 47 19.651N 053 57.147W
Outer Channel Boulder Relocation Area:
47 20.543N 053 57.405W 47 20.594N 053 57.376W 47 20.945N 053 58.703W 47 20.894N 053 58.732W
Vessels will move to transit dredged material to offshore disposal areas in the vicinity of:
Placentia Sound Offshore Disposal Site:
47 18.393N 053 55.372W
The Pond Offshore Disposal Site:
47 18.990N 053 59.576W
Multiple vessels, barges and dredges will be involved in the operations, all will be monitoring VHF channel 16 and are requesting a wide berth of at least 100 meters.
Unreliable, reduced intensity
Cable Maintenance operations from Stories Beach to Campbell River.
Hours of operations from 1500-0300 UTC Nov 17th to Nov 23rd
Vessel on site monitoring VHF CH. 80
Stay back 100M from cable lay vessel.
Privacy statement
Privacy statement, no sensible information will be sent.
You will not receive a reply. For enquiries, please contact us.